What made the project difficult.
The can is split in two and includes an inner plug, divider and perforated components. Its small size made every assembly step harder, while each part still had to nest reliably with the others.
Case 01 / European food & aviation supply
A European food and aviation supply client needed a one-time-use seasoning can with nested parts, demanding ESG requirements and enough capacity for millions of units each year.
The can is split in two and includes an inner plug, divider and perforated components. Its small size made every assembly step harder, while each part still had to nest reliably with the others.
The team stayed with the concept for two years, improving the structure and process together. Dedicated equipment brought the line to approximately 60% automation and improved both capacity and consistency.
03 / The outcome
04 / What the project taught us
Dedicated equipment becomes valuable when the structure is highly specific, demand is substantial and the relationship is likely to continue.
Evidence to add
These reserved areas will be populated after images, documents and permissions are checked.
Concept, sample iterations, sign-off and production milestones.
Structure details, production steps and approved finished pack.
Order, delivery, quality or testing proof appropriate for public use.
Have a project in mind?
Share the product, packaging role, likely volume and timing. The rest can be developed together.